All floors need to be looked after. A Raised Access Floor is no different. In addition to the care for the floor covering, whether that be bonded or surface lay, the cavity itself should be considered. For this reason we have created an Information Sheet for all our customers as a guide to the general […]
MECD, Manchester University
The building features 11,660 m2 of PSA Steel Encapsulated raised floor panels. There are additional areas of BGH which are our Heavy grade panels and BEM Edge Banded panels. These are all manufactured by Bathgate Flooring in our UK manufacturing facility.
LUSEP – Loughborough University Science Enterprise Park
OVER 5664 M2 OF STEEL ENCAPSULATED PANELS LAID ACROSS THE BUILDING WITH A SPECIFICATION BASED AROUND BGM600 PSA PANELS. THE NEW BUILD OFFERED CATEGORY A FIT OUT FOR THIS LEADING TECHNOLOGY BUILDING TO HOUSE THE GLOBAL HQ FOR THE ACCESS GROUP
Builders Conference
We are pleased to advise that we are members for another year.
Christmas at Bathgate Flooring
Click Play to View
Christmas Hours
Last date for despatch is 22nd December Office closes at 5pm on 23rd December and re-opens at 8am on 4th January. We wish you all a very merry Christmas and a prosperous 2021.