An important investment in Cheltenham and their first New Build Office development in many years
Access flooring once again was selected for this major £12 million building in Cheltenham. Bathgate Flooring manufactured and installed over 5600m2 of Steel Encapsulated Panels to ensure that this Grade A office space offered the maximum flexibility to its future tenants.
With occupation expected to commence early in 2019, the offices will provide a high quality facility and in turn a fantastic boost to the local economy.
Products Used
The process of constructing this Office Development is well recorded with a time lapse video of the entire project available through the Gloucestershire Live news story.
Access Flooring is used in buildings like this to ensure that there is easy access to the services if needed. Simply lift up the floor panels and all the cabling is visible beneath. This system also allows for floor boxes to be used so that there are no trailing wires. If in the future a new tenant takes up residence – the layout is easily re-organised to suit the new occupants.
- Architect: Roberts Limerick
- Owner: Formal Investments
- Contractor: Barnwood Construction
- Location: Jessop Avenue, Cheltenham.
- System Size: 5600 sq. m.
- Completion: Early 2019